徐州市三环东路高架快速路为徐州市第一条全封闭的快速路,也是一条融合景观、建筑的城市景观廊道。快速路全长14.81 km,穿越城区,并上跨京杭大运河。根据项目处于岩溶多发地带、重要节点多、景观要求高等特点,在徐州地区首次引进物探勘察新技术进行地质勘察,并对桥梁总体布置、结构设计、细节处理、建筑景观及施工工艺等方面进行了优化。
Xuzhou Ring Ⅲ East Road Elevated Expressway is the first fully closed expressway in Xuzhou,and is an urban landscape corridor mixed together with the landscape and buildings. The total length of expressway is 14.81 km, passes through the city area and overpasses Beijing-Hangzhou Grand Canal. Owing to the characteristics of the project located in the karst area, many important nodes and high landscape requirement, the new geophysical prospecting technology is firstly introduced to carry out the geological prospection in the areas of Xuzhou. The overall layout, structural design, detail treatment, building landscape and construction technology are optimized.