摘要
针对目前应用跨越高速公路现浇箱梁施工技术过程中存在的问题,文章分析了实际案例应用现浇箱梁施工技术的方案和构件受力验算方法,其目的是为相关建设者提供一些理论依据。
In view of the present application across the highway cast - in - place box beam construction technology in the process of the existing problems. Based on the analysis of the practical case now cast in place box beam construction technology scheme and structural stress calculation method, the purpose is in order to provide some theoretical basis to the builders.
出处
《黑龙江交通科技》
2017年第3期156-157,共2页
Communications Science and Technology Heilongjiang
关键词
跨越高速公路工程
现浇箱梁施工技术
across the highway engineering
cast in place box beam construction technology