考虑运营期收益的工程项目工期—费用动态优化

Time-Cost Dynamic Optimization for Projects Considering Income in Operation Period
下载PDF
导出
摘要 工程项目的建设期和运营期之间存在着对立统一的关系。项目建设期缩短,提前竣工投产,运营期收益将会提高,但同时也会造成建设期费用的增加。论文将工程项目工期一费用优化与项目的财务评价相结合,在考虑资金时间价值的基础上,结合运营期大型设备更换对运营收益的影响,建立以项目全寿命周期经济效益为目标的工期一费用动态优化模型,并通过案例验证了该模型的必要性与可行性。 There is a relationship of unity and opposites between the construction and operation period of the project. When the construction period of the project is shorten, and the project is put into production in advance, the income of operation period will be increased, at the same time, it will cause the increase of construction costs. Combining time-cost optimization with the financial evaluation of the project, on the basis of considering the capital time-value, paper combining with the impact of large-scale equipment replacement on the income of operation period, establishes a time-co st dynamic optimization model with economic benefits of full life cycle as the goal and proves the necessity and feasibility of the model combined with the case.
出处 《中小企业管理与科技》 2017年第13期75-76,共2页 Management & Technology of SME
基金 重庆大学城市科技学院2017校级教改项目"基于六位一体模式的课程考核体系研究与实践"(编号:YJ1728)阶段性成果
关键词 资金时间价值 运营期收益 设备更换 工期一费用动态优化 capital time-value income of operation period equipment replacement time-cost dynamic optimization
  • 相关文献

参考文献2

二级参考文献25

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部