大跨度全焊非对称断面钢桁梁桥整体吊装方案 被引量:1

Integral Lift and Assembly Strategy of Fully Welded Steel Truss Bridge with Asymmetric Section and Long-span
下载PDF
导出
摘要 随着钢引桥跨度的不断增大,为了减小钢桥自重、节省投资,采用非对称断面钢桁梁桥结构型式。非对称断面钢桁梁桥由于设置悬臂侧而成为偏心结构,吊装时需合理设置吊点位置。本文从设计角度提出了一种新的吊点布置方法——将吊点布置于横梁处,并针对新方案进行空间结构计算,在保证钢桥结构安全的前提下,为施工提供不同的吊装选择。 With the increment of span of steel bridge adopted to reduce the dead weight and cost of steel approach, steel truss bridge with asymmetric section is bridge. The steel truss bridge with asymmetric section becomes eccentric structure because it is set at the side of cantilever. The suspending points need to be set appropriately. A new layout of suspending points is proposed from the design aspect, i.e. the arrangement of suspending points on cross beam. The new plan is checked by calculating space structure. Different options may be applied in the lift and assembly operation subject to the structural safety of steel bridge.
作者 杨艳静 韩广兴 赵娟 Yang Yanjing Han Guangxing Zhao Juan(CCCC First Harbor Consultants Co., Ltd., Tianjin 300222, Chin)
出处 《港工技术》 2017年第2期79-82,共4页 Port Engineering Technology
关键词 大跨度全焊钢桁梁桥 非对称断面 整体吊装 吊点布置 fully welded steel truss bridge with long-span asymmetric section integral lift and assembly layout of suspending points
  • 相关文献

同被引文献5

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部