摘要
针对建筑光伏(PV)发电和大规模集中式PV发电中多条升压支路并联的情况,提出自适应线性调整器重启粒子群算法优化(PSO)法,通过选择合适的开关管导通时间,使各光伏阵列运行于各自的最大功率点,从而实现多路功率最优控制,并且克服了传统最大功率点跟踪(MPPT)算法在复杂环境中易陷入局部最大功率点而失效的问题。最后,通过实验验证了所提控制策略的有效性。
For the case of many Boost branches parallel connecting on the building photovohaic (PV) power generation and large-scale centralized PV system, an adaptive linear regulator restarting particle swarm optimization (PSO) algorithm is proposed.By selecting the appropriate switch conduction time,the respective PV array is operating in the respective maximum power point, in order to achieve optimal multi-channel power control and overcome the traditional maximum power point tracking(MPPT) algorithm easily fall into the local maximum power point in complex environm- ents.Finally, the effectiveness of the proposed control strategy is verified by experimental results.
作者
张海宁
姬丽雯
许长清
狄立
ZHANG Hai-ning JI Li-wen XU Chang-qing DI Li(State Grid Henan Electric Power Company Economic Technology Research Institute, Zhenszhou 450052, China)
出处
《电力电子技术》
CSCD
北大核心
2017年第5期39-41,共3页
Power Electronics
关键词
光伏发电
最大功率点跟踪
粒子群优化
photovoltaic power generation
maximum power point tracking
particle swarm optimization