千米暗立井大型凿井设备下放在玲珑矿的应用

Application of kilometer blind shaft sinking equipment in large Shandong gold mine Linglong decentralization
下载PDF
导出
摘要 根据山东玲珑矿井筒现状,大型设备尺寸无法正常下井,该矿在-270m水平施工的暗立井所需安装的提升绞车、稳车等设备都无法正常下放入井。通过采取设备组装式结构,下放时对设备进行分解,成功解决下放难题。 According to the present situation of mine Linglong tube, large equipment size (more than 3600mm in length and width of more than 1600mm, the height of more than 2100mm) can not be normal under the wells, the mine hoist installation required in the level of construction of -270m blind shaft, stability of vehicles and other equipment can not be normal into wells. The assembled structure through the equipment to take, when decentralization the equipment breakdown, successfully solve the problem. The decentralization.
出处 《山东煤炭科技》 2017年第5期43-44,46,48,共4页 Shandong Coal Science and Technology
关键词 矿山 大型设备 运输 mine large equipment transportation