摘要
根据在地铁供电系统综合联调项目中的实际经验,结合《地铁设计规范》和线路开通试运营专家评审要求,有针对性地提出了相应的联调项目及其实现方式,包括电力监控(PSCADA)子系统功能测试、直流牵引供电能力测试、交流降压负荷能力测试、主变电所支援供电能力测试以及牵引网钢轨回路阻抗测试。并对项目实施过程中的重点难点进行了归纳分析。
According to the practical experiences of united test project in metro power supply system, combined with the "Code for Design of Metro Line" and expert reviewing requirements for the opening of trial operation line, corre- sponding united test projects and the implementations, in- cluding monitoring (PSCADA)function test, DC traction power ability test,AC voltage load capacity test, main sub- station support power capacity test and traction rail loop impedance test are put forward, difficulties in the process of project implementation are inductively analyzed.