横沙岛集约化供水工程越江输水管方案比选

Comparison and Selection of River Crossing Pipeline Scheme in Hengsha Island Intensive Water Supply Project
下载PDF
导出
摘要 横沙岛集约化供水工程中,将长兴岛上的供水管道延伸至横沙岛需穿越位于长江口的横沙通道,穿越距离约1.7公里。目前能够以非开挖方式一次性穿越如此长距离的技术手段主要包括顶管和水平定向钻进。文中就这两种技术手段提出四种穿越方案进行综合比选,并推荐最优输水管越江方案。 In Hengsha Island intensive water supply project, extending the water supply pipelines from Changxing Island to Hengsha Island needs to cross the Hengsha passage which is located in the Yangtze River Estuary, and the crossing distance is about 1.7 km. There are two technology means including pipe jacking and horizontal directional drilling, which can cross such a long distance without a break at present. In this paper, there are four fiver-crossing schemes based on the two trenchless techniques putting forward to carry out comprehensive comparison and selection and the best one will be recommended.
出处 《净水技术》 CAS 2017年第A01期135-139,共5页 Water Purification Technology
关键词 长距离 越江管 顶管 水平定向钻进 long distance river crossing pipeline pipe jacking horizontal directional drining
  • 相关文献

参考文献4

二级参考文献6

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部