期刊文献+

大跨度悬索桥钢箱梁吊控制分析 被引量:3

The Installation Analysis for the Steel Box Girder of Long Span Suspension
下载PDF
导出
摘要 大跨径悬索桥钢箱梁节段吊装是主梁施工的关键工序,吊装过程中结构的内力和变形变化显著,吊装方案不合理会在加劲梁节点处产生较大次应力,降低结构安全储备。论文以重庆寸滩长江大桥为工程背景,主要研究在钢箱梁吊装施工过程中线形变化及各相邻钢箱梁截面之间开口距离的变化规律,为钢箱梁的合理吊装施工提供依据。 Long-span suspension bridge stiffening girder segment segment hoisting is the key in the process of construction of main girder, lifting structure internal force and deformation of significant change, lifting scheme unreasonable large secondary stress is generated in the stiffening girder nodes and reduce the structural safety reserve.By way of example of Chongqing Cuntan River Bridge, main research on the stiffening girder hoisting linear changes in the construction process and the adjacent stiffening girder section openings between the distance variation, stiffening girder reasonable hoisting construction, provides the basis for.
作者 刘晓涛
出处 《工程建设与设计》 2017年第9期172-174,177,共4页 Construction & Design for Engineering
关键词 悬索桥 钢箱梁 吊装 线形 顶推 suspension bridge steel box girder hoisting linear push
  • 相关文献

参考文献4

二级参考文献8

共引文献51

同被引文献19

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部