期刊文献+

高压试验中变压器试验存在的问题及处理方法 被引量:2

Problems and Solutions of Transformer Test in High Voltage Test
下载PDF
导出
摘要 如今科学技术不断发展进步,我国整体工程发展中,工业占有着非常重要地位,因此,当前工作中主要任务就是加强其水平提升,电力系统发展中变压器是其中一项关键设备,变压器的更加稳定运行需要进行高压试验,保证施工结果的准确性,在当前的变压器试验过程中,影响试验的结果以及变压器的正常应用中确实存在不少影响性的因素,因此,下面文章对变压器试验工作进行了简要阐述,并根据当前存在的问题进行讨论,希望能够提升电力系统中变压器的实际应用。 With the continuous development and progress of science and technology, industry occupies a very important position in the development of the whole project.Therefore, the main task of the current work is to enhance its level.Transformer is one of the key equipments in power system development.The more stable operation of the transformer needs to carry on the high pressure test to guarantee the accuracy of the construction result.In the current transformer test process, there are many factors affecting the results of the test and the normal application of the transformer.Therefore, this thesis briefly described the transformer test work, and discussed the existing problems, hoping to enhance the practical application of the transformer in the power system.
出处 《企业技术开发》 2017年第3期77-79,共3页 Technological Development of Enterprise
关键词 高压试验 变压器试验 工作问题 high voltage test transformer test Problem
  • 相关文献

参考文献3

二级参考文献6

共引文献2

同被引文献3

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部