摘要
介绍了R/S分析方法的基本原理与操作步骤,并采用该方法,对山西省某矿区矿井涌水量时间序列进行了分析,结果表明该矿井涌水量预测系统现在或未来的状态均与前5个月状态持续相关。
The paper introduces the basic principle and operation steps of R/S analysis method, analyzes the time sequence of the water inflow of shaft of some mine in Shanxi with the method, and proves the mine water inflow forecasting system's states in present and future are constantly re-lated to the status in five month ago.
出处
《山西建筑》
2017年第4期108-109,共2页
Shanxi Architecture