摘要
介绍了工程变更的含义与类型,基于工程变更产生的原因,提出了工程变更的签发原则,并从优化设计方案、加强合同管理、规范审批程序等方面,阐述了加强工程变更管理的措施,有利于实现工程项目的投资与工期目标。
The paper introduces the definition and types of the engineering change, points out the releasing principle for the engineering change based on the causes of forming the engineering change, and illustrates the measures to improve the management over the engineering change from the optimal design scheme, promotion of the contract management, and planning and approval procedure, so as to realize the investment and aims of the phases in the projects.
出处
《山西建筑》
2017年第4期241-243,共3页
Shanxi Architecture
关键词
工程变更
设计方案
合同管理
审批程序
engineering change, design scheme, contract management, approval procedure