摘要
本文以水电工程定额为基础,与水利、电力、公路、建筑等行业的人工工资、典型分部分项综合单价、间接费率等进行对比分析,通过取费基数比较和实际费率测定分析,得出水电(抽水蓄能电站)工程定额价格水平处于中等偏上的结论。
After comparing the ration of water-power engineering with the rations of other industries ( water conservancy, electricity, construction, and etc ) in terms of labor wages, integrated cost of typical aspects and the rate of indirect cost, with the analyzation of the difference between these rations, the conclusion becomes clear that the the price level of ration of hydro-power plant ( pumped storage power plant ) is higher than those of the average ration of the most industries of the society.
出处
《水电与抽水蓄能》
2017年第2期141-145,共5页
Hydropower and Pumped Storage