构建井工煤矿三维信息模型系统研究 被引量:3

Establishment of three-dimensional information model system for underground coal mine
下载PDF
导出
摘要 针对现有三维矿业软件的功能,结合井工煤矿开采特点,提出了井工煤矿三维信息模型系统,构建适用于井工煤矿的"BIM"。详细介绍了该系统最终全面实现从全地层地质建模、井巷设计、施工管理、生产管理等工作的可视化、数字化与智能化。该系统的应用,使项目各参与方在全生命周期中共享项目信息,进而消除浪费和提高工效,并可推动井工煤矿三维信息化建设进程。 According to the functions of current three- dimensional design software for mining industry, a three- dimensional information modeling system for underground coal mine was proposed combining with the underground characteristics, and the "BIM" for underground mines was established, which realized the visualization, digitization and intelligentization of whole strata geological modeling, roadway design, construction management, production management, etc. With apphcation of the system, participants of the project can share information during full life cycle, so as to eliminate waste, enhance construction efficiency and promote the three- dimensional informatization construction of underground mine.
作者 胡成军
出处 《煤炭工程》 北大核心 2017年第5期30-32,共3页 Coal Engineering
关键词 井工煤矿 三维信息模型 全生命周期 underground coal mine three-dimensional information model full life cycle
  • 相关文献

参考文献7

二级参考文献45

  • 1过俊.BIM在国内建筑全生命周期的典型应用[J].建筑技艺,2011(1):95-99. 被引量:141
  • 2陈术彭.地理信息系统导论[M].北京:科学出版社,1999..
  • 3GB50384-2007,煤矿立井井筒及硐室设计规范[S].
  • 4Eastman C, Teicholz guide to building managers, designers 2nd ed. New Jersey: P, Sacks R, etc. BIM handbook: a information modeling for owners, engineers, and contractors [ M ]. John Wiley & Sons, 2011 : 13.
  • 5Lee C, Sacks R, Eastman C. Specifying parametric building object behavior (BOB) for a building information modeling system [Jl. Automation in Construction, 2006, 15 (6): 758-776.
  • 6Patrick C S. Evaluating the impact of building information modeling (BIM) on construction [C- //7th International Conference on Construction Applications of Virtual Reality, 2007: 206-215.
  • 7Smith D K, Tardif M. Building information modeling: a strategic implementation guide for constructors, and real estate asset Jersey: John Wiley & Sons, 2009: managers 115. engineers [M]. New.
  • 8Akinci B, Fischer M, Kunz J. Automated generation of work spaces required by construction activities [ J]. Journal of Construction Engineering and Management, 2002, 128 (4): 306-315.
  • 9Hyun Jeong Choo, Iris D Tommelein, Glenn Ballard, etc. WorkPlan: constraint-based database for work pacakage scheduling [ J]. Journal of Construction Engineering and Management, 1999, 125 (3): 151-160.
  • 10Sriprasert E, Dawood N. Multi-constraintinfor mation management and visualization for collaborative planning and control in construction [ J ]. Electronic Journal of Information Technology in Construction, 2003 ( 8 ): 341-366.

共引文献192

同被引文献27

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部