6Chan-Sik Park,Do-Yeop Lee,Oh-Seong Kwon,Xiangyu Wang.A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template[J].Automation in Construction.2013
7Changmin Kim,Hyojoo Son,Changwan Kim.Automated construction progress measurement using a 4D building information model and 3D data[J].Automation in Construction.2013
8Kristen Barlish,Kenneth Sullivan.How to measure the benefits of BIM — A case study approach[J].Automation in Construction.2012
9Javier Irizarry,Ebrahim P. Karan,Farzad Jalaei.Integrating BIM and GIS to improve the visual monitoring of construction supply chain management[J].Automation in Construction.2012
10Atul Porwal,Kasun N. Hewage.Building Information Modeling (BIM) partnering framework for public construction projects[J].Automation in Construction.2012