摘要
地下室抗浮锚杆穿透底板防水层,因没有较规范的节点构造,也没有成熟的经验可循,锚杆防水成为技术空白和"三不管"地带,由此带来的问题相当严重。本文介绍了"环氧砂浆坐拼钢板+PVC过渡卷材"和"非固化橡胶沥青灌封+预铺反粘过渡卷材"两种抗浮锚杆连续防水构造节点设计,供同行参考。
The basement antl-floating anchor penetrates waterproofing layer, due to nonstandard node structure and no mature experience to follow, anchor waterproofing is blank and limbo to technology, so the problem is very serious. This article introduces two kinds of continuous node waterproofing structure design including epoxy mortar on steel transition + PVC transition membrane and non-curing rubber modified asphalt potting + pre-laid transition membrane.
出处
《中国建筑防水》
2017年第10期37-39,共3页
China Building Waterproofing
关键词
地下室
抗浮锚杆
连续防水节点设计
环氧砂浆
过渡卷材
非固化橡胶沥青
basement
anti-floating anchor
continuous waterproofing design
epoxy mortar
transition membrane
non-curing rubber modified asphalt