摘要
为满足玉龙喀什水利枢纽工程勘测设计要求,缩短现场岩体试验周期,保证试验结果的准确可靠,对现场岩体直剪试验与室内岩块模拟试验进行对比得出:野外试验周期一组约为45天左右,室内试验试验周期10天左右,室内试验与现场试验值较为接近,表明室内模拟现场原位试验是可行的,室内试验可以降低试验成本,缩短试验周期,保证试验结果的准确可靠。
In order to meet the requirements of the survey and design of the Yulong Kashi Water Conservancy Project and to shorten the test period of the rock mass in the field and ensure the accuracy and reliability of the test results, the direct shear test of the rock mass in the field is compared with the simulation test of the indoor rock block. The indoor test is feasible, and the indoor test can reduce the test cost and shorten the test period to ensure the accuracy and reliability of the test results. The indoor test can reduce the test cost and shorten the test period.
出处
《陕西水利》
2017年第3期98-100,共3页
Shaanxi Water Resources
关键词
岩体直剪试验
内摩擦角
黏聚力
模拟试验
The direct shear test of rock mass
internal friction angle
cohension and the simulation test