摘要
为解决综放工作面采空区密闭墙构筑位置与构筑厚度不合理导致的密闭墙受压易致裂、浪费材料等问题。文章采用理论分析和数值模拟的方法,对成庄矿4320综放工作面采空区密闭墙的构筑位置与构筑厚度进行研究,得出采空区密闭墙合理厚度为2 m,最佳构筑位置在距回风巷4 m处的结论。
In order to solve the problem that the mined - out area closed wall of the fully mechanized caving faceis cracked and wasted due to the unreasonable construction position and the thickness of the closed wall. In this paper, theoretical analysis and numerical simulation are used to study the construction position and thickness of the mined - out area closed wall in the4320 fully mechanized caving face. The results show that the best position is 4m far away from the intersections of contact roadway and return airway, reasonable closed wall thickness is 2 m.
出处
《煤》
2017年第6期3-5,27,共3页
Coal
关键词
采空区
密闭墙
构筑位置
合理厚度
mined - out area
closed wall
construction position
reasonable thickness