摘要
长6油藏开发过程中,产能不断降低,必须采取必要的增产技术措施。经过现场的实践检验,实施压裂、酸化增产技术措施效果明显,极大地提高了油藏的生产能力,提高了油藏的产量,为长6油藏的开发提供了技术支持。
During the development of Chang 6 reservoir, with the continuous reduction of production capacity, it is necessaryto take the necessary technical measures to increase production.After the on-site practice test, the implementation of fracturing,acidification and production technology measures the effect is obvious, greatly improve the production capacity of the reservoir toimprove the production of reservoirs for the development of long 6 reservoir provides technical support.
出处
《化工设计通讯》
CAS
2017年第4期62-62,共1页
Chemical Engineering Design Communications
关键词
长6油藏
增产措施
探讨
long 6 reservoir
stimulation measures
discuss