摘要
在横梁风电场初步设计中,根据工程所在地的地质条件、施工条件等,提出风电场集电线路敷设的电缆直埋、架空线以及电缆-架空混合三种方案。综合考虑项目运行的安全性、稳定性以及地区经济的发展要求等特点,本工程推荐采用具有较多优点的电缆直埋方案。
In the preliminary design of the Hengliang Wind Power Farm, three schemes of the collecting power lines, including the direct buried cable scheme, the overhead line scheme and the combination scheme, are proposed and compared according to the geological and construction conditions of the project site. Considering the operational safety and stability, and also the requirement of regional economic development, the direct buried cable scheme is finally selected as it is of more advantages.
出处
《水电与新能源》
2017年第5期71-73,共3页
Hydropower and New Energy
关键词
横梁风电场
初步设计
集电线路
电缆直埋
架空线
Hengliang Wind Power Farm
preliminary design
collecting power lines
direct buried cable
overhead lines