摘要
以腰沙一、二期通道工程为例,从项目对周边环境、工程的影响出发,就施工期的施工方案、固废处理、生物保护,营运期的相关影响等提出一系列优化措施,将环境危害降至最低。
Taking the sand waist phase I, II channel engineering as an example, from the view of project impact on the surrounding environment and engineering, a series of measures to optimize the environment is put forward aiming at construction scheme, the solid waste treatment, biological protection in construction period and related effects in operation period, while the risk of environment can be minimized.
出处
《水运工程》
北大核心
2017年第B05期29-32,64,共5页
Port & Waterway Engineering
关键词
围填海工程
通道
环境保护
reclamation projects
channel
environmental protection