摘要 以洋山深水港区钢管桩码头工程为例,对沿海复杂地质区嵌岩桩施工难点——海上施工平台搭设、冲孔吊打和钢桩焊接工艺进行分析,并提出对策,为沿海复杂地区嵌岩桩实施提供了安全、可靠、简便及节约资源的施工方法。 Taking Yangshan deepwater port steel-pipe piled wharf engineering for example, this paper probes into the construction difficulties of rock-socketed piles in the coastal area of complicated geologic conditions, i.e., setting up of the offshore construction platform, punching and lifting and steel pile welding, and puts forward countermeasures to provide a safe, reliable, convenient and energy-saving construction method for the construction of the rock-socketed pile in the coastal area with complicated geologic conditions.
作者 徐熙明
出处 《水运工程》 北大核心 2017年第B05期53-56,共4页 Port & Waterway Engineering
关键词 嵌岩桩 海上平台 冲孔吊打工艺 rock-socketed pile offshore platform punching and lifting process
  • 相关文献

同被引文献5

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部