摘要
针对曹妃甸某大型专业化煤码头的翻车机房工程,在建设中运用钢筋定位、模板加固、大体积混凝土施工3种关键技术。根据不同施工条件对施工工艺进行调整,通过采用这3种技术的应用使大型翻车机房工程满足质量要求。
Aiming at Caofeidian tipping machine room of a large specialized coal wharf engineering, this paper uses the reinforced location, template reinforcement and mass concrete construction key technologies in the building process.Under the different construction conditions, these construction technologies are adjusted to satisfy the construction quality requirements of large tipping machine room engineering.
出处
《水运工程》
北大核心
2017年第B05期73-76,共4页
Port & Waterway Engineering
关键词
翻车机房
钢筋定位架技术
模板加固
大体积混凝土
连续加强带
tipping machine room
reinforced location technology
template reinforcement
mass concrete
reinforcing band