摘要
以太湖流域现状工程为基础,利用成熟的数值模拟计算技术,结合骨干工程和区域工程调度,模拟计算了"99南部"100 a一遇典型降雨条件下,太浦闸不同调度方案引起的不同泄洪流量对太湖及下游河网地区产生的影响。
Abstract: Based on the present situation of engineering projects of Taihu Basin, this paper used a mature numerical simulation technology, combined with the scheduling of main projects and regional projects to simulate different flood flows resulting from scheduling schemes of the Taipu Brake under the condition of "1999 Southern" typical rainfall. It also analyzed the impact of flood flows on downstream river networks. It would provide the reference to optimization of project scheduling.
出处
《浙江水利科技》
2017年第3期1-4,16,共5页
Zhejiang Hydrotechnics
基金
水利部公益性行业科研专项项目(编号:201501015)
浙江省科技计划项目(2013C33033)
关键词
数值模拟
调度
太浦闸
value simulation
scheduling
Taipu brake