八钢B高炉定修休风料加入实践

Eight steel blast furnace B constant damping down mixture into practice
下载PDF
导出
摘要 高炉休风是高炉生产中经常发生的事情,它包括事故处理、设备检修等项目.进入2014年以来, B高炉经历了两次计划检修.在计划满炉料休风中,做好休风准备工作,下好休风料,高炉按时休风,复风后迅速恢 复炉况是很重要的.此次B高炉正确装人休风料,使得高炉开风后炉况恢复良好,快速达到休风前水平. Damping down blast furnace is often appear in the production of blast furnace, It includes accident treatment, equipment maintenance and other projects. Entered since 2014, B blast furnace had two plans to overhaul. Damping down in plan full burden damping down, ready for work, good damping down material, make the blast furnace damping down on time, quickly restored after the wind furnace condition is very important. The B right into the damping down blast furnace, blast fur-nace condition recovered well after opening the wind, rapid damping down before.
作者 舒艺 Shu Yi(Xinjiang Bayi Iron and Steel Co. Baosteel Group Wulumuqi 830022 Chin)
出处 《黑龙江冶金》 2016年第6期50-52,共3页
关键词 休风 休风料 减矿率 Damping down Damping down order material Ratio of the mine
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部