摘要
核电站水力平衡调试方法一般采用迭代法,试验工作量大,周期长,效率不高。本文通过对AP1000中央冷冻水系统的分析,提出采用补偿法和迭代法相结合的新方法,大大提高了水力平衡的效率。
The commissioning method of hydraulic balance in nuclear power plant usually applies iterative method, which has test big work load, long test period, and low efficiency. In this paper, through the analysis of AP1000 central chilled water system, a new commissioning method adopted compensation method and iteration method was put forward, which improves the efficiency of hydraulic balance greatly.
出处
《建筑热能通风空调》
2017年第5期93-95,共3页
Building Energy & Environment
关键词
水力平衡
迭代法
冷冻水
补偿法
hydraulic balance, iteration method, chilled water, compensation method