本溪衍水大桥施工关键技术

Key Construction Technology for Benxi Yanshui Bridge
下载PDF
导出
摘要 本溪衍水大桥主桥为单拱斜塔双索面斜拉桥,主桥主跨采用152m双箱双室钢箱梁,主桥边跨为(48m+42m)双箱双室预应力混凝土现浇箱梁。大桥施工采用的高强度嵌岩钻孔桩旋挖钻快速成孔技术、大体积承台混凝土温控技术及塔梁同步平衡法施工技术施工速度快,安全可靠,为同类桥梁的建造积累了宝贵的经验。 The main bridge of Benxi Yanshui Bridge is a double plane cable stayed bridge with a single - arch leaning tower, the main span of the main bridge adopts a 152m double -box and double -room steel box girder, and the side span of the main bridge adopts a(48m + 42m) double - box and double - room cast - in - situ box girder of prestressed concrete. The bridge construction adopts rapid pore - creating technology for rotary excavating drill of high strength rock - socketed bored pile, temperature control technology for mass concrete of bearing platform and construction technology with synchronized balance method for tower beam, with rapid construction speed and safety and reliability, thus accumulating valuable experience for the construction of similar bridge.
作者 刘博
出处 《北方交通》 2017年第5期19-22,共4页 Northern Communications
关键词 斜拉桥 钻孔桩 大体积混凝土 塔梁同步平衡法 桥梁施工 Cable -stayed bridge Bored pile Mass concrete Synchronized balance method for towerbeam Bridge construction
  • 相关文献

参考文献2

二级参考文献7

  • 1GB/T3811-2008起重机设计规范[S].
  • 2鞍钢集团钢绳厂.GB8918-2006重要用途钢丝绳[S].北京:中华人民共和国国家质量监督检验检疫总局,2006.
  • 3杨文渊.起重吊装常用数据手册[M].北京:人民交通出版社,2001.
  • 4GB5976-1986,钢丝绳夹[S].
  • 5黎桂英,何悦胜,陶亚秋,等.最新五金手册(修订版)[M].广州:广东科技出版社,2001.
  • 6刘继红.梭形独塔斜拉桥钢塔安装技术研究[J].现代商贸工业,2011,23(3):290-291. 被引量:1
  • 7高辉.斜拉桥圆环钢塔节段吊装与支护[J].山西建筑,2012,38(33):197-199. 被引量:6

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部