超大面积复杂因素影响下深基坑分阶段实施的设计与施工 被引量:5

Design and Construction for Deep Foundation Excavation Constructed by Multi-stage Under Influence of the Extra Large Area with Complicated Factors
下载PDF
导出
摘要 多种复杂因素的制约和影响下,设计和施工、技术和管理的协同推进,是摆在项目建设者面前的难题。以铁路杭州东站站房项目为例,对超大面积复杂因素影响下深基坑分阶段实施的设计方案与施工组织进行分析。监测数据反映,该基坑施工过程中,支护体系安全稳定。 It is a hard question for designers that how to combine design, construction, technique and management together and push them forward cooperatively under restriction and impact of various and complicated factors. Based on the project of station buildings of Hangzhou East Railway Station, this paper analyzed the design and constructional organization of deep foundation excavation, which is constructed in multi-stage. It was showed by monitoring data that the supporting system was stable and safe during construction.
出处 《施工技术》 CAS 北大核心 2017年第10期7-11,15,共6页 Construction Technology
关键词 深基坑 开挖 分阶段 设计 施工 deep foundation excavation multi-stage design construction
  • 相关文献

参考文献6

二级参考文献46

共引文献27

同被引文献34

引证文献5

二级引证文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部