摘要
杭州东站站房工程单体规模大、施工难度大,技术要求高,很多技术项目为国内首次使用,工程施工受到社会各界的高度关注。在前期客观条件和施工周边环境等多项因素的制约下,工程队采取了从一次转场到两次转场等6项有效措施保证了生产进度实施。
With large-scale project, greatly difficuh construction, highly technical requirement, and many techniques applied for the first time, the project of station buihlings of Hangzhou East Railway station has attracted much attention from community. With the objective condition in early stage and surrounding environment as well as other restrictions, construction team adopted 6 effective measures, including from one time transition to two times transition, to ensure the production schedule.
出处
《施工技术》
CAS
北大核心
2017年第10期107-109,共3页
Construction Technology
关键词
火车站
项目管理
施工进度
研究
railroad stations
project management
construction schedule
research