5Tung Daxun. Distribution of Temperature Stresses Along the Continuously Welded Track [R]. American Railroad Engineering Association, Bulletin 692, 1983, 35--51.
6Kish A, Samavedam G, Jeong D. Analysis of Thermal Bucking Tests on U. S. Railroads[R].Technique Report,NTIS-PB83-203554, 1982, 21--102.
7Jeong D, Samavedam G, Kish A. Determination of Track Lateral Resistance from Lateral Pull Tests[R] . Final Report,NTIS-PB86-225612, 1986, 1--49.
8Samavedam G, Kish A, Jeong D. Parametric Studies on Lateral Stability of Welded Rail Track [R]. Technique Report,NTIS-PB83-215517, 1983, 1--59.
9Kish A, Samavedam G, Jeong D. Influence of Vehicle Induced Loads on the Lateral Stability of CWR Track [R]. Final Report, NTIS-PB85-168853, 1985, 1--93.
10Luo Y. A Model for Predicting the Effect of Temperature Force of Continuous Welded Rail Track [C] . Proceedings of the Institution of Mechanical Engineers, Part F, 1999, 213: 117--124.