辐射监测系统出厂验收管理

Ex-factory Acceptance and Management of Radiation Monitoring System
下载PDF
导出
摘要 验收工作是生产制造转安装调试的关键环节,为了保证电厂辐射监测系统验收工作的顺利进行,对电厂辐射监测系统验收组织与管理方法进行总结和阐述。介绍了验收前的准备工作,验收实施过程中的抽样、试验以及设备验收注意事项与收尾事宜。验收前需要检查设备文件、提出设备硬件要求、对设备进行抽样检查;实施设备验收需进行设备外观检查、设备性能试验;验收后需完成遗留整改、设备参数的出厂设置、明确发货事宜等工作。验收过程中应注意检查的全面性,保证验收质量。其对辐射监测系统的验收管理具有一定指导意义。 The acceptance work is the key link in the production and debugging. To ensure smooth progress of the acceptance work, organization and management of nuclear radiation monitoring system were concluded and introduced in the article. The article is described in the following points, the preparatory work, sampling experiment, performance test, points for attention, and final work. The following work should be completed before acceptance, check the file, put forward equipment hardware requirements, and sampling inspection. Appearance inspection, performance test should be completed in the second stage. The rectification, restoring factory settings and clearing the delivery are the finishing work. Have an overall inspection is necessary for ensuring acceptance quality. The article has guiding significance to the acceptance management of radiation monitoring system.
出处 《兵工自动化》 2017年第5期23-24,49,共3页 Ordnance Industry Automation
关键词 辐射监测系统 出厂验收 组织管理 radiation monitoring system ex-factory acceptance organization and management
  • 相关文献

参考文献1

二级参考文献12

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部