摘要
同期、测量及计量系统作为GT13E2燃气-蒸汽联合循环项目中实现国产化的重要电气单元,必须完全匹配GT13E2燃机发电动机通用规范,同时符合我国现行规范。文中详细介绍了一种一体化机组配置方案和整定参数,完美的替代了ALSTOM标准同期设备。
Synchronizing, metering and measuring system is an important electrical unit of GT13E2 gas steam combined cycle project localization; it must exactly match the GT13E2 gas turbine generator general specification, and must conform to the current standard specification of china. In this paper, an integrated unit configuration scheme and setting parameters are introduced in detail, which can perfectly substitute for ALSTOM standard equipment.
作者
王丹丹
罗振琨
WANG Dandan LUO Zhenkun(Harbin Turbine Company, Harbin 150046, China)
出处
《机械工程师》
2017年第9期129-130,共2页
Mechanical Engineer
关键词
燃机
电气
同期、测量及计量系统
国产化
gas turbine
electric
synchronizing,metering and measuring system
localization