新春煤矿突出煤层合理预抽期研究 被引量:1

Study of Reasonable Pre-drainage Period of Outburst Coal Seam in Xinchun Coal Mine
下载PDF
导出
摘要 煤矿瓦斯灾害治理是全世界共同面临的难题,我国把瓦斯抽放,即"先抽后采"作为预防措施,有效地降低了瓦斯事故,但抽放周期过长,影响了矿井的正常生产。通过对新春煤矿M3煤层试验区钻孔瓦斯抽出量研究,得出了钻孔控制区域内瓦斯累计抽出量与预抽时间的拟合关系,计算出M3煤层瓦斯合理预抽期。 Gas disaster control is difficulty problem that all of the world faced, and gas drainage in domestic like ’ drainage first thenmining ‘ as prevention measures, and then gas disaster was decreased effectively, but drainage period was long, then mining produc-tion was influenced. According drilling hole gas drainage of test area of M3 coal seam i Xinchun coal mine, then coupling relationshipbetween drainage amount and drainage time of controlling area by drilling hole, the reasonable drainage period of M3 coal seam was ob-tained.
出处 《煤矿开采》 北大核心 2017年第3期125-128,共4页 Coal Mining Technology
关键词 突出煤层 瓦斯抽采 抽出量 预抽期 outburst coal seam gas drainage drainage amount pre-drainage period
  • 相关文献

参考文献2

二级参考文献1

  • 1张子戌,张子敏,王兆丰.瓦斯地质与瓦斯防治进展[M].北京:煤炭工业出版社,2007.

共引文献7

同被引文献7

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部