掘进时高应力近距离巷道工程稳定性研究

Study on Stability of High Stress Short Distance Roadway Engineering during Advancing
下载PDF
导出
摘要 采用现场监测、理论分析及数值模拟等方法,对高应力近距离巷道在开挖过程中产生的扰动及稳定性进行了分析研究。对开挖工序和一次爆破掘进长度等掘进方案的数值进行模拟,研究结果表明:应力释放区域会在动载荷的作用下扩大,是由于巷道围岩及邻近硐室受到巷道开挖所产生的变形扰动所致;在一次爆破掘进长度较短时,整段巷道的变形会因为扰动次数的增加而增大,反之亦然。 The perturbation and stability of high-stress short-distance roadway during excavation are analyzed by field monitoring,theoretical analysis and numerical simulation. The results show that the stress release area will ex-pand under the action of dynamic load, which is induced by the roadway excavation conducted to surrounding rock and the adjacent chamber. In a blasting tunneling with short length, the whole section of the roadway deformation will increase, and vice versa.
作者 王旭平 WANG Xuping
出处 《山西焦煤科技》 2017年第3期12-15,共4页 Shanxi Coking Coal Science & Technology
关键词 高应力 近距离巷道 机械掘进 爆破掘进 扰动 稳定性 High stress Close distance roadway Mechanical advancing Blasting advancing Disturbance Sta-bility
  • 相关文献

参考文献6

二级参考文献62

共引文献136

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部