期刊文献+

600 MW超临界火力发电机组高加泄漏风险预控及操作 被引量:2

600 MW Supercritical Thermal Power Generating Units of High Leakage Risk and Operation
下载PDF
导出
摘要 600 MW超临界火力发电机组中的高压加热系统对于机组的效率、经济性有非常重要的作用,一旦高加系统发生故障,轻则导致机组效率降低、重则导致机组停机甚至设备损坏。因此,在机组运行过程中,有效的监视高加系统及相关参数等,可以及时的判断出高加是否存在故障,并做好风险防范,把高加泄漏故障消除于最初状态,使得机组经济性及安全性得到极大的保障与提升,对于同类机组有一定的借鉴意义。 High pressure heating system 600 MW supercritical thermal power generating units in the(hereinafter referred to as 'being') is very important for the efficiency and economy of the unit, once the heater system malfunction, light causes the unit efficiency, will lead to the shutdown or equipment damage. Therefore, in the operation process, monitoring system and high effective parameters, can timely judge whether there is high failure, and do a good job of risk prevention, to eliminate high leakage fault in the initial state, the unit economy and safety guarantee and improve greatly, have certain reference significance for similar unit.
出处 《能源研究与管理》 2017年第2期104-106,共3页 Energy Research and Management
关键词 高加 泄漏 给水 流量 high pressure leakage water supply discharge
  • 相关文献

参考文献6

二级参考文献19

共引文献20

同被引文献7

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部