期刊文献+

政府和社会资本合作模式下合同提前终止的影响因素研究 被引量:9

Influencing Factors of the Early Contract Termination Under the Public-Private Partnerships Mode
下载PDF
导出
摘要 首先在对相关文献分析整理的基础上,从政府和社会资本合作(PPP)项目全寿命周期集成的视角,提取了15个造成合同提前终止的影响因素,明确每个影响因素的责任主体,然后进一步构建解释结构模型,阐明各影响因素之间的层次结构关系,分析导致PPP模式下合同提前终止的直接因素、间接因素和深层因素,最后指出政府和社会资本在项目不同阶段应着重关注的影响因素,并提出避免PPP项目合同提前终止的建议。 Based on the analysis of related literature, this research extracts 15 influence factors that affect the early contract termination from the perspective of whole lifecycle of PPP projects, and clarifies each influence factor’s main responsibility. Then it builds the inter-pretative structural model, illustrates the hierarchical structure relation of each influence factor, and analyzes the direct, indirect and underlying factors leading to early contract termination of PPP projects. At last, it points out the influence factors which are worth noting particularly for the government and private sector during different phases of projects, and proposes some advice to avoid early contract termination of PPP projects.
作者 郭捷楠 郝生跃 任旭 Guo Jienan Hao Shengyue Ren Xu(School of Economics and Management, Beijing Jiaotong University,Beijing 100044,China)
出处 《中国科技论坛》 CSSCI 北大核心 2017年第6期123-130,共8页 Forum on Science and Technology in China
基金 北京交通大学基本科研业务费人文社会科学专项基金项目(2015jbwy014)
关键词 PPP 提前终止 影响因素 解释结构模型 Public-private partnerships Early termination Influencing factors Interpretive structural model
  • 相关文献

参考文献4

二级参考文献62

  • 1钱维,龚向虎.公共基础设施特许经营合约与风险治理研究—以南京长江隧道工程为例[J].中国工程科学,2007,9(3):62-66. 被引量:1
  • 2周国光.利用非国有资本加快高速公路建设的理论探索[J].长安大学学报(社会科学版),2007,9(1):1-5. 被引量:15
  • 3林晓言.从台湾高铁BOT方案看民间投资基础设施的三大保障.探究铁路经济问题,2009,(2).
  • 4Berdica K, Matlsson Lars- Goran. Vulnerability: A Model - Based Case Study of the Road Network in Stockholm [ M ]. Critical infrastructure : Reliability and vulnerability [ M ]. New York : Springer, 2007:81 - 106.
  • 5Taylor M A P, S V C Sekhar, G M D' Este. Application of Accessibility Based Methods for Vulnerability Analysis of Strategic Road Networks [ J ]. Networks and Spatial Economics, 2006 ( 6 ) : 267 - 291.
  • 6Jenelius E, Petersen T, Mattsson, L G. sRoad Network Vulnerability: Ldentifying Important Links and Exposed Regions [ J ]. Transportation Research A, 2006 (40) :537 - 560.
  • 7Husdal J. Reliability and Vulnerability Versus Cost and Benefits [C]. The 2nd International Symposium on Transportation Network Reliability, Queenstown and Christchurch, New Zealand, 20 - 24 August 2004. 180 - 186.
  • 8Husdal J. The Vulnerability of road Networks in a Cost - benefit Perspective [ C ]. Proceedings of the Transportation Research Board Annual Meeting, Washington DC, USA, 9 - 13 January, 2005. s1 -17.
  • 9Srinivasan K. Transportation Network Vulnerability Assessment: A Quantitative Framework [ R ]. Security Papers (Knoxville: Southeastern Transportation Center, University of Tennessee) , 2002.60 79.
  • 10Chen A, Yang C, Kongsomsaksakul S, Lee M, Network - based Accessibility Measures for Vulnerability Analysis of Degradable Transportation Networks [ J]. Networks and Spatial Economics, 2007, 7(3):241 -256.

共引文献108

同被引文献75

引证文献9

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部