浅谈海外EPCC项目的试车管理 被引量:3

DISCUSSION ON COMMISSIONING MANAGEMENT IN OVERSEAS EPCC PROJECTS
下载PDF
导出
摘要 目前海外石化炼化工程建设项目大多采用EPCC(设计、采购、施工、试车)总承包模式,其中试车是关键的环节,而我国炼化工程公司在这一环节缺乏相关的经验,成为了制约这些公司走出国门的因素。介绍了试车工作和管理的重要性,分别从试车团队、策划、管理和控制等方面阐述了试车工作应注意的事项和建议。 Nowadays, most of the overseas refinery and petrochemical projects adopt EPCC(Engineering,Procurement,Construction and Commissioning)general contract mode,and commissioning is crucially important,but Chinese petrochemical engineering companies' lack of commissioning experiences become the restricting factor for overseas project execution.This paper introduces the importance of commissioning and management, discusses the matters needing attention during commissioning from the aspects of commissioning team,planning,management and control,and gives some suggestions,providing some reference for Chinese petrochemical engineering companies to develop business in overseas EPCC projects.
作者 马洪波
出处 《石油化工设计》 CAS 2017年第2期72-75,共4页 Petrochemical Design
关键词 炼化工程 EPCC总承包 试车管理 试车团队 进度控制 Refinery and petrochemical project EPCC general contract Commissioning management Commissioning team Progress control
  • 相关文献

参考文献2

二级参考文献4

共引文献11

同被引文献7

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部