摘要
论述了造价控制在项目管理全过程中发挥的作用,从决策、工程设计、招投标、施工、决算五个阶段,探讨了工程建设不同时期进行造价控制与管理的策略,从而减少工程建设的成本投入。
The paper discusses the role of cost control in whole-process project management, and explores cost control and management strategies at different engineering construction periods from five phases of decision making, engineering design, tender and bidding, construction and final settlement, so as to reduce engineering construction cost investment.
出处
《山西建筑》
2017年第13期224-226,共3页
Shanxi Architecture
关键词
工程造价
设计方案
招投标
预算总额
engineering cost, design scheme, tender bidding, total budget