摘要
目前核电业务呈多路线、多基地的发展趋势,加上核电工程设计工作量巨大、专业分工精细的特点,使得异地间的相关专业在核电工程设计中出现越来越多的交叉设计,导致各专业间的提资频率越来越密集。如何缩短各地之间工程设计数据的同步时间,甚至做到工程设计数据实时同步,是核电工程异地协同设计领域值得研究的问题。从系统验证的角度出发,利用现有流行的虚拟化技术对核电工程专业设计同步协同进行一次深入探索和验证,在原有设计平台架构的基础上增加一套辅助接入平台,实现远程用户接入并进行核电工程协同设计。研究成果对后续设计生产平台升级与优化具有指导性意义。
At present, the nuclear power business shows the development trend of multi-route, multi-base develop- merit trend. Coupled with the huge workload of nuclear power engineering design and the free division of labor cha- racteristics, the relevant professional in different places appearsmore and more cross-design in the nuclear power en- gineering design, resulting in the frequency of funding becoming more and more dense between the various profes- sional. How to shorten the synchronization time of engineering design data between different places, and even achieve real-time synchronization of engineering design data is worth to study in the field of collaborative design of nuclear power projects. From the point of view of system verification, the existing popular virtualization technology was used to carry out an in-depth exploration and verification on the synergetic synergy of nuclear power engineering design, and a set of auxiliary access platform was added on the basis of the original design platform structure to real- ize remote user access and collaborative design of nuclear power projects. The research results have guiding signific- ance for the follow-up design and production platform upgrade and optimization.
出处
《电信科学》
北大核心
2017年第5期171-175,共5页
Telecommunications Science
关键词
核设计平台
虚拟化
核电工程
同步协同
nuclear design platform, virtualization, nuclear power engineering, synchronized collaboration