穿越沿海回填区域地铁隧道施工技术

Construction Technology of the Tunnel Crossing Coastal Backfilling Area
下载PDF
导出
摘要 某地铁暗挖法区间隧道处于早年沿海城市海边回填区域,其地层结构具有典型的"上软下硬"特点,地下水十分丰富,地面建筑密集繁杂。施工中将如何控制地下水危害,预防隧道土体坍塌、地表沉降,减少爆破对周边环境的扰动作为施工控制要点。通过干扰降水,地表注浆导管柱加固,洞内全断面前进式注浆,环向分次控制爆破等新技术措施,达到安全快速施工目的。 Some running tunnel with subway subsurface excavation method locates backfilling area in seaside of coastal city, whose stratum structure has the typical characteristics with up-soft and down-hard, groundwater is rich, surface buildings stand in great numbers. The construction control points include groundwater hazard control, preventing soil collapsing of tunnel and surface settlement, reducing disturbance caused by blasting. Some new technical measures are used including interference precipitation, reinforcement of surface grouting pipe column, advance grouting with whole section in tunnel, circumferential blasting and so on ,which achieve the construction goal.
作者 顾金权
出处 《施工技术》 CAS 北大核心 2017年第11期90-93,共4页 Construction Technology
关键词 隧道工程 注浆导管柱 回填区域 环向爆破 施工技术 tunnels grouting pipe column backfilling area circumferential blasting construction
  • 相关文献

参考文献3

二级参考文献15

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部