期刊文献+

水电移民农村居民点道路规划及指标研究 被引量:2

Study on Road Planning and Index for Rural Resettlement Site of Hydroelectric Project
下载PDF
导出
摘要 通过对水电移民农村居民点影响因素、规划依据及相关案例分析,提出移民居民点道路规划目标、原则、规划方式,并从路网形式、道路分级、技术指标及与外部交通的衔接等方面探讨适合水电移民居民点道路交通规划。 Based on the analyses of influencing factors, planning basis and related case studies of rural resettlement site project of hydropower project, the planning objectives, principles and methods of road traffic in rural resettlement site are put forward, and then the road traffic planning which is suit for rural resettlement site of hydropower project is discussed from the aspects of road network form, road classification, technical specifications and the interface with external traffic system.
作者 袁子轶 胡波
出处 《水力发电》 北大核心 2017年第6期9-12,共4页 Water Power
关键词 道路交通规划 技术指标 移民 农村居民点 road traffic planning technical specification resettlement rural settlement
  • 相关文献

参考文献4

二级参考文献14

  • 1童明.阅读城镇形态[J].时代建筑,2002,45(4):28-33. 被引量:3
  • 2齐康.文脉与特色—─城市形态的文化特色[J].城市发展研究,1997,4(1):20-24. 被引量:51
  • 3徐循初,黄建中.城市道路与交通规划(下册)[M].北京:中国建筑工业出版社,2006.
  • 4Michael G H Bell, Yasunori lida. The Network Reliability of Transport[J]. Proceedings of the Ist International Symposium on Transportation Network Reliability (instr)[M]. Oxford: Elsevier,2003.
  • 5上海同济规划设计研究院.遵义市中心城区城市综合交通规划[Z].2006.
  • 6上海徐循初城市规划设计有限公司.重庆沙坪坝核心区交通规划[Z].2004.
  • 7中华人民共和国建设部(GB50220-95).城市道路交通规划设计规范[S].北京:中国建筑工业出版社,1995.
  • 8凯文·林奇.城市意象[M].华夏出版社,2001.37-46.
  • 9江苏省城市规划设计研究院.徐州丰县大沙河镇陈庄村村庄建设规划[Z].2007.
  • 10胡纹,刘涛.“重点受控”与“局部放任”─—山地城市设计方法研究之一[J].建筑学报,1997(12):40-43. 被引量:7

共引文献86

同被引文献18

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部