摘要
抚顺东舍场排土方式为电铁排土工艺,排弃物主要来源为抚顺东露天矿的剥离物以及页岩炼油厂排弃的废渣。随着东露天矿的剥离量逐步增加以及页岩炼油厂新建两部干馏炉废渣排弃量的增加,使得东舍场排弃能力不能满足生产需要,为此提出了东舍场排土规划,解决排土能力不足的问题。
Dumping way in Fushun eastern dump is the electric iron dumping technology. The discharged material is mainly from the stripping of Fushun East Open-pit Mine and the waste residue from the oil shale refinery. With the East Open-pit Mine stripping volume gradually increase and two new shale refinery distillation furnace slag discharge quantity increases, the abandoned capacity of East Dump cannot meet the needs of production. This article proposes the dumping planning to solve the proDlem of insufficient ability of dumping.
出处
《露天采矿技术》
CAS
2017年第5期27-30,33,共5页
Opencast Mining Technology