盾构退场后的维修保养

Overhaul Maintenance after Shield Machine Transfer
下载PDF
导出
摘要 盾构机退场后,需进行必要的检修、保养或局部的设计改造,根据设备的实际状况及后续项目的水文地质条件,在盾构退场后对各系统进行检修、保养及功能的优化升级。根据设备检修的项目、重点及注意事项,提出了盾构检修的质量保证及验收要求,并对盾构检修的安全文明施工做了详细的说明。 From the former project to the latter project, shield machine needs necessary overhaul, maintenance or par- tial design modification. According to the equipment actual situations and hydro-logical and sub-surface conditions of fea- sible following project, overhaul, maintenance and functions upgrade should be made before shield machine transfer. Ac- cording to the project, key points and stipulations of facility maintenance, this paper explains quality assurance and accep- tance requirements of shield overhaul, and illustrates safe and civilized production of shield overhaul in detail.
作者 吕兰亮
出处 《江西科技学院学报》 2017年第2期34-39,共6页 Journal of Jiangxi University of Technology
关键词 盾构机 维修保养 质量保证及验收 安全文明施工 shield machine overhaul maintenance quality assurance and acceptance safe and civilized construction
  • 相关文献

参考文献1

二级参考文献6

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部