送样检测是资产管理关口前移的重要措施,其结果用于评估供应商产品质量和生产、研发能力的品控行为。本文对10k V全绝缘环网柜一次送样检测的送检情况、检验策略进行了描述,并分析了其检验结果,发现不合格项目由多至少依次为短时耐受和峰值耐受电流试验、防护等级验证、机械操作、分合闸时间、回路电阻测量、机械性能试验、雷电冲击试验,说明了当前环网柜供应商仍然是良莠不齐。同时还对送样检测发现的不合格检验项目可能产生的影响和原因进行了详细分析,同时提出了相应的建议。
Admission testing is an significant measure for asset management of Guangzhou Power Grid. It is used to as- sess the supplier's product quality, and research ability in quality control. The test strategy of Guangzhou power grid 10kV fully insulated ring network cabinet sample detection inspection situation,described, and analyzed the test results, found unqualified project by turns short -time and peak withstand current test, protection grade verification, mechanical operation, switching time, loop resistance measurement, mechanical performance test, lightning impulse test, shows that the current ring network cabinet supplier is still uneven, some good and some bad. Influence and reason also to send sam- ples detected unqualified projects may have carried out a detailed analysis, and put forward the corresponding suggestion.
作者
叶建斌
易满成
顾春晖
杨鹏
李刚
YE Jian-bin YI Man-cheng GU Chun-hui YANG Peng LI Gang(Electric Power Test and Research Institute of Guangzhou Power Supply Bureau, Guangzhou 510000, China)
出处
《电气开关》
2017年第3期84-87,共4页
Electric Switchgear
基金
基金项目:基于全生命周期管理的配网开关设备寿命延长措施关键技术的研究与实践(K-GZM2014-029)
关键词
10kV全绝缘环网柜
送样检测
品质控制
质量问题
lOkV fully insulated ring network cabinet
sample detection
quality control
quality problem