介绍了沉井施工在国内的应用,结合火电厂输煤系统转运站的结构特点,探讨了沉井施工工序、沉井的测量及纠偏、沉井封底操作以及沉井施工中的注意事项。
This paper introduces the application of open caisson construction in China, characteristics of transfer station of coal handling system in thermal power plant, discusses the open caisson, the measurement and correction of the open caisson, the operation of the bottom according to the structural construction process of the sealing of the open caisson and the matters needing attention in the construction of the open caisson.