摘要 在装配过程中,不确定性因素会引起作业元素操作时间的波动,进而引起工位作业时间的波动,装配线的节拍也会随之变化,装配线实际节拍及产能的估算难度增大、准确度降低。针对此问题,采用仿真实验的方法对随机型装配线进行研究。利用Matlab数值分析软件随机生成不确定的操作时间,并将其通过COM接口导入Plant Simulaton仿真软件。基于Plant Simulaton对装配线建立模型并进行仿真,反映出操作时间的波动对工位以及整线的影响,并为该装配线的实际节拍的估算提供了依据。 In the assembly process,uncertain factors make the operation time and workstations time fluctuate,which leads to the uncertainty of the cycle time.It would be more difficult to estimate the cycle time and production capacity of the assembly line,and the estimation accuracy would reduce.Aiming at this problem,the stochastic assembly line is studied using simulation experiments.The uncertain operation time is generated randomly by the numerical analysis software Matlab which is imported into the simulation software Plant Simulaton through COM interface.The model is established and simulated based on Plant Simulaton,which reflects the influence of the fluctuation of the operation time on the station and the entire line,and provides the basis for the estimation of the assembly line cycle time.
出处 《现代制造技术与装备》 2017年第5期19-20,31,共3页 Modern Manufacturing Technology and Equipment
关键词 装配线 时间波动 仿真 实际节拍 assembly line stochastic time simulation cycle time
  • 相关文献

参考文献3

二级参考文献22

  • 1曹振新,朱云龙,赵明扬,尹朝万,李富明.混流装配线负荷平衡与投产排序的优化研究[J].信息与控制,2004,33(6):660-664. 被引量:24
  • 2Parviz Fattahi,Mohsen Salehi.Sequencing the mixed-model agsembly line to minimize the total utility and idle costs with variable hunching interval[J].Int J Adv Manuf Technol,2009(45):987-998.
  • 3Rahimi-Vahed A R,Rabbani M,Tavakkoli-Moghaddam R.et al.A multi-objective scatter search for a mixed-model assembly line sequencing problem[J].Advanced Engineering Informaties,2007(21):85-99.
  • 4RAHIMI VAHED A R, RABBANI M, TAVAKKOLI MOGHADDAM R, et al. A multi objective scatter search for a mixed model assembly line sequencing problem [J]. Advanced Engineering Informatics, 2007, 21 (1) : 85-99.
  • 5MILTENBURG J, SINNAMON G. Scheduling mixed model multi-level just in time production systems [J]. International Journal of Production Research, 1989,27(9) :1487- 1509.
  • 6BUKCHIN Y, RABINOWITCH I. A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs[J]. European Journal of Operational Research, 2006,174 ( 1 ) : 492 508.
  • 7SIMARIA A S, VILARINHO P M. A genetic algorithm based approach to the mixed-model assembly line balancing problem of type Ⅱ [J]. Computers & Industrial Engineering, 2004, 47 (4) :391-407.
  • 8VILARINHO P M, SIMARIA A S. A two-stage heuristic method for balancing mixed model assembly lines with parallel workstations [J]. International Journal of Production Research, 2002, 40 (6): 1405-1420.
  • 9MATANACHAI S, YANO C A. Balancing mixed-model as- sembly lines to reduce work overload[J]. IIE Transactions, 2001, 33(1) :29-42.
  • 10XHAO X, OHNO K, LAU H S. A balancing problem for mixed model assembly lines with a paced moving conveyor [J]. Naval Research Logistics, 2004, 51(3):446-464.

共引文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部