摘要
结合深圳地铁7号线上沙站工程的实际情况,介绍了该工程施工期间临时占用道路设计方法,从车行道、人行道、主体围挡、交通标志设置等方面,阐述了施工期间交通疏解方案,从而保证道路交通的有序性。
Combining with actual conditions of Shangsha station of Shenzhen subway line No. 7 , the paper introduces temporary occupied road de-sign methods during the engineering construction period, and describes traffic reconciliation scheme during the construction period from aspects of roadway, pedestrian, major enclosure and traffic sign setting, so as to guarantee the road traffic orderly.
出处
《山西建筑》
2017年第14期9-10,共2页
Shanxi Architecture
关键词
地铁
道路
交通疏解方案
交通标志
subway, road, traffic reconciliation scheme, traffic sign