露天矿矿界调整与开采优化方案研究 被引量:2

Study on Mine Area Adjustment and Mining Optimization of Open Pit Mine
下载PDF
导出
摘要 平朔矿区经30 a开发后,出现了生产成本高、征地困难、过小煤窑采空区、新技术应用等诸多问题。通过对东露天矿和安太堡露天矿采剥现状分析,就两矿矿界调整、采区互换、工作线长度优化等问题进行了研究,并对矿界方案进行了优化,有效确保了两矿未来稳定、高效、低成本开采。 After few decades of development for 30 years, the problems of high production costs, land acquisition difficulties, coal mines goafs, new technology applications and many other issues appeared in Pingshuo mining area. Based on the analysis of the present situation of Dong open pit mine and Antaibao open pit mine, the min area adjustment, the mining area exchange and the optimization of the working line length were studied,and the mine area plan was optimized which ensured the stability, efficiency, low -cost development of the mine.
作者 武懋 周游
出处 《煤炭技术》 北大核心 2017年第6期86-88,共3页 Coal Technology
关键词 露天矿 矿界调整 开采优化 open pit mine mine area adjustment mining optimization
  • 相关文献

参考文献7

二级参考文献45

  • 1罗永高,陈一波.三次函数的三大性质[J].中学数学杂志(高中版),2005(3):18-19. 被引量:3
  • 2顾正洪,查振高.近水平矿床内排重要技术参数的确定[J].中国矿业大学学报,1996,25(3):38-42. 被引量:14
  • 3于汝绶,张瑞新,王宝庭,等.露天采矿优化理论与实践[M].北京:煤炭工业出版社,2005.13-15.
  • 4Lemieux M J. Moving cone optimizing algorithm [ A]. The Computer Method for the 80's in the Mineral Industry [ C]. Weiss A. New York: AIME, 1979:329-345.
  • 5Lerchs H, Grossmann I F. Optimum design of open-pit mines [J]. CIM Bull, 1965, 58:47 -54.
  • 6Korobov S. Method for determining optimum open-pit limits [ R]. Technica] Report EP74 -R -4, Montreal: Ecole Polytechnique, 1974.
  • 7Dowd P A, Onur A H. Open-pit optimization-part 1: optimal open-pit design [J]. Trans. Instn. Min. Metall. (Sect. A: Min. Industry), 1993, 102: A95-A104.
  • 8Zhao Y, Kim Y C. A new optimum pit limit design algorithm [A]. Proc. 23rd Symposium on the Application of Computers and Operations Research in the Mineral Industry (APCOM) [ C]. Littleton, Colo. AIME, 1992:423 -434.
  • 9Yegulalp T M , Arias A J, Muduli P, et al. New development in ultimate pit limit problem solution method [ J ]. Transactions, 1993, 294:1 851 -1 855.
  • 10Gershon M E. An open-pit production scheduler: algorithm and implementation [J]. Min. Engng. , 1987, 39:793 -796.

共引文献68

同被引文献21

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部