摘要
桔桐坑小流域水电梯级开发 ,为三级开发方案 ,以沙铺砻水电站为枢纽 ,结合开发贵庄口水电站、金坑口水电站工程。本文从工程地质角度出发 ,利用三个水电站工程 。
The hydropower step-development project(classⅢ)in the drainage area of Wutongkeng is pivoted with the Shapulong Hydropower Station,and combined with the development of the hydropower projects in Guizhuangkou and Jinkengkou. Viewing at the angle of engineering geology and taking advantages of the three hydropower stations,this paper studied the engineering geological conditions of the drainage area of Wutongkeng.
出处
《浙江地质》
2002年第1期58-63,共6页
Geology of Zhejiang
关键词
梯级开发
水电站
工程地质条件
浙江
库岸
稳定性
step-development,hydropower station, engineering geological conditionl, Wutongkeng