摘要
以济南市轨道交通R2线工程为例,重点研究R2线建设规划方案与线网、铁路、周边建筑物、高架桥、文物遗址、客流等之间的关系。通过进行方案研究,并召开专家评审会,对R2线建设规划方案进行优化调整,以降低工程实施难度、减少房屋拆迁、提高客流效益,从而使线网布局更加均衡,同时为其他城市轨道交通前期规划研究工作提供参考。
Taking Ji'nan transit line R2 project as an example, this paper focuses on the relationship between the line R2 construction plans and lines and networks, railways, vicinity buildings, viaducts, heritage sites, and passenger flows etc. Through study of the schemes, and the review meeting of experts, the line R2 construction plan is adjusted and optimized, reducing the construction difficulties and housing demolitions, improving passenger traffic efficiency, so that the line and network layout are more balanced, and it provides a reference for future urban rail transit planning study.
出处
《现代城市轨道交通》
2017年第6期36-40,共5页
Modern Urban Transit
关键词
城市轨道交通
建设规划方案
优化调整
urban rail transit, construction planning, optimization adjustment